200KGHOUR INCINERATOR
HICLOVER, Nanjing Clover Medical Technology Co.,Ltd, supply system solutions for medical environmental protection, animal and pet cremation engineering, other municipal solid waste incineration project.
We supply single combustion chamber, double combustion chambers, three combustion chambers and multi-combustion chambers waste incinerators for laboratory, clinic, hospital, medical center, hygiene clinical waste destruction with medical disposable, biological waste, medical plastic waste, hazardous waste, red bag waste, needle disposal, gauze and bandages, sealed sharp containers, pathological waste, trace-chemotherapeutic wastes, etc.
1.The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
The Temperatures of combustion: Minimum will be 850oC and max 1400oC
Post combustion: >1100oC.
2.The Internal diameter of the Chimney: Ø 400mm² and its height: 8 m
3.The Volume of the combustion chamber: 1.200 L
4.The Dimension of the door for loading in cm: 70×70.
5.Burner operation should be Automatic On/Off
6.Fuel : diesel
7.The supplier must provide necessary information for the best of the installation
This incinerator with “PYROLYTIC” combustion must have:
8.A combustion chamber of waste:
Perfectly tight door for the manual loading of waste. The loading should be Manual, Batch Load
A burner of lighting which the use is limited to the ignition of waste.
Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating out of
refractory.
The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminum and
insulates bricks in order to assure a minimum temperature on the outside sheet metal.
Composition of the refractory;
Refractory concrete :
. Thickness : ≥100 mm
. Nature: 42% of Al203
Insulate in fibrous panels :
. Thickness: ≥75 mm
Nature: Calcium silicate.
Burner of lighting of waste, with fuel, standard mono-bloc casting guiding plunging flame, lighting and safety of
electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
Plate of combustion in Carborundum, avoiding the fixing of glass and slags.
9.A chamber of post combustion of gases
A burner of combustion of gases,
A device of injection of air allowing a total recombustion of gases,
A device of air inlet of cooling of waste gases,
A sheath of evacuation of the gases burnt.
Carcass in strong sheet steel with support of connection.
Composition of the refractory;
Refractory concrete :
Thickness : ≥150 mm
Nature: 65% of Al203
Insulate in fibrous panel :
Thickness: ≥85 mm
Nature: Calcium
Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition,
permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
A secondary injection of air to ensure perfect oxygen content.
10.A control box ensuring the complete cycle of combustion.
11.Fan:
Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following
the control of the automatic cycle.
12.Controls and regulations:
Control box water tight to dust, including:
A switch circuit breaker for each engine (ventilators and burners).
A timer with adjustable temporization for the regulation of each burner.
A regulator with digital watching for the temperature of combustion.
A regulator with digital watching for the temperature of post combustion.
Electric box.
21. The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual batch
de ashing.
22. Process Filtering system: Scruber to be mentioned as optional
23. Emission Standards Compliance: BS 3316 or equivalent standard
23. Capacity to treat Plastic: Not less than 40% by weight
24.CE Manufacturing Compliance: BS EN 746-2-1997
13.The supplier must give batches of spare parts of first urgency and consumable of the incinerator.
14.The installed incinerator must bear a one year guarantee.
15.The supplier shall perform an onsite installation of the incinerator.
25. The technical training of operators will have to be provided and given by a technician from
the factory; it will consist of curative and preventive maintenance, and the use of machine, etc
16.Fence Wire for Incinerator House (Chain Link) should be NOT less than 2.5Meters height.
17.Waste Storage Bay and Ash Pit drawings attached.
NB.: Civil works and any other related services for the installation and training of operators must be included in the
incinerator’s price.
Specification for the shelter of the incinerator:
House of the incinerator must have facilities for hand washing and firefighting).
This material and equipment must include in the shed of the incinerator: foundation in rubble stone, isolation roofing
against humidity; elevation with brick of 20 cm (bloc cement), continuing lintel (linteau) in reinforced concrete; steel
frame (charpenteen metal); roofing in sheet B.C.A. 28 BG
ESTIMATES
Waste is thermally decomposed in the primary chamber at temperatures of 800 °C +. The resulting gaseous products are
completely oxidized in the secondary chamber at higher temperatures with sufficient resident time. Other specifications are
as follows:
i Brand Type & Model Model -Smokeless
ii Burning Capacity Max. 200kgs/h
iii Auxiliary Fuel Diesel
iv Type of Burner Monoblock automatic burners
v Temperatures Primary Chamber: 800°C ± 50°C
Secondary Chamber: 1300°C ± 50°C
PRIMARY CHAMBER
i Type Static solid hearth
ii Material of Construction Mild Steel
iii Refractory thickness 115 mm thick
iv Material Refractory bricks
v Insulation thickness 50 mm thick
vi Waste Charging Manual
vii Ash Removal Manual
SECONDARY CHAMBER
i. Type Static solid hearth
ii. Material of Construction Mild Steel
iii. Refractory thickness 115 mm thick
iv. Material Refractory bricks
v. Insulation thickness 50 mm thick
COMBUSTION FAN
i. Type Centrifugal
ii. Modulation Manual damper control
iii. Material of Construction Mild Steel
CONTROL PANEL
i. Type of temperature controller Digital
ii. Finish & painting type Double coat
STORAGE SERVICE TANK
i. Material of construction & capacity Mild Steel/ Plastic, suitable capacity
ii. Other Standard Accessories Diesel oil level indicator, piping with valves & Non-return valve
iii. Visual Checking of Fuel Provided
BURNER
i. No. of Burners 2 one in primary and in secondary chamber)
ii. Type & Model Monoblock automatic oil fired, Model GR-20
iii. Make Riello
iv. Fuel Diesel
v. Fuel delivery 10 – 20 kg/h
vi. Firing stage 1
vii. Thermal power 118 – 236 kW
viii. Motor power 240 W
ix. Pump pressure 10 – 12 bar (standard calibration), Max. pressure 15 bar
x. Electrical supply Single phase 220V, 50Hz.
CHIMNEY
i. Material of construction Burnt bricks
ii. Height 9meters from ground level
HICLOVER Solution for Fighting COVID-19, Medical Waste Incinerator(Containerized Mobile Incinerator)
Tel: +86-25-8461 0201
Email: [email protected]
Email: [email protected]
Email: [email protected]
Nanjing Clover Medical Technology Co.,Ltd.
2020-07-10
